Independent desktop property report

The most important building is the one you call home.

Enter an address to see what a home may need, what it could cost and what to check in person.

From $19.99 · First look in minutes · Australia-wide

Sunlit entrance to a weatherboard home framed by a garden
What arrives

A sample Read.

Open the full sample
Homechecker

Interwar brick bungalow

Melbourne VIC
What we see

This interwar brick bungalow has a later rear addition, with older terracotta roofing and a mix of original and updated fabric. Most of the maintenance over the coming years relates to the older parts of the home, particularly the roof, exterior timberwork and concealed electrical services.

The original footings and bathroom waterproofing are also worth checking, as their condition cannot be established from the available material. A roof assessment, sub-floor inspection and electrical check would help clarify what, if anything, needs attention in the earlier years of ownership.

The shape

The next decade, at a glance.

How anticipated work is distributed across the home’s shell, systems and spaces.

ShellSystemsSpace
1 YR2–5 YR6–10 YR
Shell$48k68%Systems$9.7k14%Space$13k19%

Around $71,000 is anticipated over the next decade, including $5,500 for checks. Further work may be needed depending on what those checks reveal; the relevant allowances are explained in the items below.

Where to look

Needs confirmationCritical

The age and type of the concealed wiring are not confirmed. If it remains original, it would be beyond a normal service life. Have an electrician establish what is installed before relying on the allowance.

2–5 YR$12k–$22k
Some evidenceCritical

The terracotta roof shows local tile deterioration and uneven ridge mortar. A close inspection will define the repair coverage, access and junction details before the planned refurbishment is quoted.

2–5 YR$29k
Needs confirmationImportant

No cracking is apparent in the illustrative imagery, but the original house and later addition may use different footing types. A sub-floor or structural inspection should check the junction.

2–5 YR$9.0k–$24k
Some evidenceImportant

The bathroom appears older and serviceable. Its waterproofing and renovation date are not documented, so a moisture check should come before any renewal allowance is treated as necessary.

2–5 YR$22k–$43k

What to ask

Questions worth asking

6
Has the switchboard or wiring been updated, and are there any electrician reports or invoices?

Why it matters. The read could not confirm the age or type of the concealed wiring and switchboard.

A useful answer. The vendor can provide an electrician report, invoices or a rewiring date showing what has been assessed or upgraded.

When was the terracotta roof last inspected or repaired?

Why it matters. The roof is the largest planned line, but the imagery cannot establish tile breakage, ridge condition or remaining life.

A useful answer. A recent roof report or maintenance invoice identifies its condition and any completed repairs.

Has any cracking or movement appeared around the original house or rear addition?

Why it matters. Different footing types at the junction can move differently even when no distress is visible from the street.

A useful answer. No movement is known, or any past assessment and repairs are documented by a suitably qualified professional.

Has the bathroom been renovated, and is there any waterproofing documentation?

Why it matters. The bathroom looks older, while concealed waterproofing cannot be assessed from photographs.

A useful answer. The renovation date and waterproofing records are available, or the vendor confirms the bathroom is older and undocumented.

Has an asbestos assessment been completed before any previous renovation?

Why it matters. The construction eras make asbestos-containing materials possible, but their presence cannot be established from imagery.

A useful answer. A report identifies what is present and where, or the vendor confirms no assessment has yet been completed.

Are there permits or completion records for the rear addition?

Why it matters. The roof form indicates a later addition, but its date, construction and approval status are not confirmed.

A useful answer. The vendor can provide the building permit and final or occupancy documentation for the addition.

Records worth finding

6
Vendor's Statement (Section 32)

Sets out the title, notices and disclosed building information for a Victorian sale.

Any prior building and pest inspection reports

May resolve or add detail to the roof, footing, sub-floor and moisture questions in this read.

Building permit and final or occupancy documentation for the rear addition

Confirms when the addition was approved and completed.

Electrician reports or rewiring invoices

Shows what has been inspected or upgraded in the switchboard and concealed wiring.

Any asbestos or hazardous-materials assessment

Identifies whether suspect materials have previously been assessed and where they were found.

Roof inspection and repair invoices

Dates previous maintenance and helps establish the roof covering’s remaining life.

Heavy goingA lot converging here on the read. Worth sitting with for a moment. Put the questions in section 6 to a building inspector and work through what they find. Either it holds up once you understand it properly, or you've learned that early — and either way you're acting with your eyes open.
01

Summary

Our read of the building.

This interwar brick bungalow has a later rear addition, with older terracotta roofing and a mix of original and updated fabric. Most of the maintenance over the coming years relates to the older parts of the home, particularly the roof, exterior timberwork and concealed electrical services. The original footings and bathroom waterproofing are also worth checking, as their condition cannot be established from the available material. A roof assessment, sub-floor inspection and electrical check would help clarify what, if anything, needs attention in the earlier years of ownership.

02

What stands out

What's worth sitting with.

Needs confirmation
Electrical & switchboard
The age and type of the concealed wiring are not confirmed. If it remains original, it would be beyond a normal service life. Have an electrician establish what is installed before relying on the allowance.
Some evidence
Roof & rainwater
The terracotta roof shows local tile deterioration and uneven ridge mortar. A close inspection will define the repair coverage, access and junction details before the planned refurbishment is quoted.
Needs confirmation
Foundations
No cracking is apparent in the illustrative imagery, but the original house and later addition may use different footing types. A sub-floor or structural inspection should check the junction.
Some evidence
Bathrooms
The bathroom appears older and serviceable. Its waterproofing and renovation date are not documented, so a moisture check should come before any renewal allowance is treated as necessary.
Needs confirmation
Hazardous materials
A home of this era and its later addition may contain asbestos-containing materials. Arrange an assessment before renovation or other work that could disturb them.
03

Ten year view

What's needed across the next decade, and where it sits.

Works$65k

What the read suggests may be needed over the next decade, with indicative planning allowances shaped to the assessed scope.

Checks$5.5k

Inspections and specialist checks worth arranging to test what the read can only infer.

Allowances$56k–$115k

Possible costs where the read cannot yet confirm the need or scope. Some may not be needed once more is known.

Go into the detailStart with what matters most, or see everything behind the read.Priority items
What the work is for
Committed spend by part of the building
  • Shell$48k70%Roof, walls, façade, foundations, drainage
  • Systems$9.5k15%Heating, cooling, plumbing, electrical, fire safety
  • Space$13k20%Kitchens, bathrooms, internal layout, compliance, environmental
04

Where spend goes

By part of the building, ordered by what's needed.

Works Checks Allowances
05

Priority register

The items we think matter most for this decision.

06

Questions worth asking

Put these to whoever can answer them — a building inspector, or whoever holds the records.

  1. Why this matters

    The read could not confirm the age or type of the concealed wiring and switchboard.

    What a good answer looks like

    The vendor can provide an electrician report, invoices or a rewiring date showing what has been assessed or upgraded.

  2. Why this matters

    The roof is the largest planned line, but the imagery cannot establish tile breakage, ridge condition or remaining life.

    What a good answer looks like

    A recent roof report or maintenance invoice identifies its condition and any completed repairs.

  3. Why this matters

    Different footing types at the junction can move differently even when no distress is visible from the street.

    What a good answer looks like

    No movement is known, or any past assessment and repairs are documented by a suitably qualified professional.

  4. Why this matters

    The bathroom looks older, while concealed waterproofing cannot be assessed from photographs.

    What a good answer looks like

    The renovation date and waterproofing records are available, or the vendor confirms the bathroom is older and undocumented.

  5. Why this matters

    The construction eras make asbestos-containing materials possible, but their presence cannot be established from imagery.

    What a good answer looks like

    A report identifies what is present and where, or the vendor confirms no assessment has yet been completed.

  6. Why this matters

    The roof form indicates a later addition, but its date, construction and approval status are not confirmed.

    What a good answer looks like

    The vendor can provide the building permit and final or occupancy documentation for the addition.

07

Documents worth requesting

The records that answer what this read can only raise. Request them from whoever holds them.

  1. Sets out the title, notices and disclosed building information for a Victorian sale.

  2. May resolve or add detail to the roof, footing, sub-floor and moisture questions in this read.

  3. Confirms when the addition was approved and completed.

  4. Shows what has been inspected or upgraded in the switchboard and concealed wiring.

  5. Identifies whether suspect materials have previously been assessed and where they were found.

  6. Dates previous maintenance and helps establish the roof covering’s remaining life.

When any of these arrive, add them to this read and we will update it.

How to get the most from your Read

  • Built from the evidence.A desktop review of public records, visible signs and what you shared. Some things need confirming in person.
  • Made for planning.Use the read and the register together. Costs and timing are a guide, and you can update as more comes to light.
  • Take it to your inspection.Brief your building and pest inspector with it. Check key findings with professionals before you decide.
  • Then firm it up.Get quotes before work, and legal advice on contracts.

Read our Terms

07

About Homechecker

What this is

Homechecker is a desk-based reading of the building. We work from any documents you share (a building report, photos, plans, notes) and the public signal set for the property — satellite and street-level imagery, council and planning records, market context. A structured methodology and AI-assisted analysis read the building together, with output integrity checks before delivery and ongoing quality audit. It's the same method we use for institutional clients, translated for a single home.

What this isn't

This forecast is not a building inspection, pest inspection, engineering report, valuation or legal advice. It is a structured reading of the evidence available, designed to inform decisions — not certify outcomes.

How to use it
  1. Read the summary first — it tells you what the building looks like on the read.
  2. Take the questions worth asking to a building inspector, or whoever holds the records.
  3. Open the Register for the full 21-item list with cost reasoning — useful for your conveyancer or builder.
How a Read works

A first look, then as deep as you want to go.

  1. 01

    First look

    Share the address. The Read shows what the home may need, what it could cost and what to check.

  2. 02

    Sharpen it

    Add a Section 32, an inspection report or your own photos, before the Read runs or any time after.

  3. 03

    Keep it

    The ten-year view, the questions worth asking and the full register.

Know the house before you bid.

See what may need attention, which documents and questions matter, and what to confirm at the inspection.

What it costs

Choose how many homes you want to understand.

Prices in AUD · Reads never expire.

Commercial property?TryMoyne Ross

The ShortlistMost popular

For comparing homes, revisiting options or keeping a few properties in view.

$49.993 Reads
Read three homes →
Questions

What people ask before they start.

A Read is the whole report on one home. It gives the overall picture, the repairs the home is likely to need over the next ten years, which matter most and the questions worth asking, and it carries the register. It is worked out from the public record, what can be seen of the building and any reports or documents you share.

The register is the itemised list inside a Read. Each line is one part of the building, with what is likely to be needed, an indicative cost band, when it is likely to fall due, how much it matters and how strong the evidence is. You can filter it on screen and download it as a spreadsheet.

No. Nobody visits the home. A Read is a desktop review that shows where the likely repair costs sit and what is worth confirming in person. It works alongside a building and pest inspection and does not replace one.

Only the address. If you have an inspection report, a Section 32, strata records, quotes or your own photos, adding them sharpens the Read wherever they reach.

Most Reads are ready within minutes. A small share are set aside for a person to check before release, and some take longer when there are documents to read. We aim to deliver every Read within 48 hours.

Existing houses, townhouses and apartments across Australia. A Read needs a building to look at, so we cannot read a home that has not been built yet.

Yes. Add documents or photos when you have them and ask for an update. Up to five updates are included with each Read.

Yes, with the people helping you, such as your partner, inspector, builder, conveyancer or broker. Send a private link, which lasts 90 days and can be withdrawn at any time, or download the register as a spreadsheet.

They are stored in Sydney and used to prepare your Read. Part of that work is done by AI services overseas, under terms that stop them training on your material. We do not sell your information, and we delete your documents when you ask.

Yes. Buyers use a Read to understand a home before committing. Owners use it to see what is likely to come up over the next ten years and where to look first.

The most important building is the one you call home.

From $19.99 · Sample